Our Projects
Imperial War Museum
ROOFING, RAINWATER GOODS AND MANSAFE SYSTEM INSTALLATION
At the historic IWM Duxford site, we delivered a comprehensive rainwater goods upgrade, roofing repairs, and mansafe system installation across the Grade II* listed Hangars 3 and 4 (constructed 1917–18), together with Hangar 5. The works were carefully designed and executed to respect the architectural and heritage significance of these early aviation structures, while enhancing their long-term durability and safety. Our scope included the refurbishment and replacement of rainwater goods to improve drainage performance and mitigate water ingress, targeted roofing repairs to preserve the integrity of the original fabric, and the installation of a compliant mansafe fall-protection system to enable safe ongoing maintenance. All works were undertaken in accordance with listed building constraints, combining conservation-sensitive detailing with modern performance standards to secure the continued operational use of these landmark hangars.




Rede Place
PRIME RESIDENTIAL
Owner purchased 15,000 sq ft property in 2021, house was in-habitable and required full remodeling. Scope of works included complete rip out back to bear structure to allow structural modifications & incorporate complete redesign and new M&E including air conditioning to all major spaces in the property. Moreover, bespoke marble clad staircase was commissioned, and similarly high-end finishes were specified throughout. External façade works were also undertaken to favour a monolithic image rather than the ornate styling of the previous owner. Later stages to the property included restoration and refurbishment of the outhouses and to build a new exterior swimming pool with entertainment barn.




Burwood Park
PRIME RESIDENTIAL
In 2023, the client purchased the c.5,000 sq ft property that was generally in good condition minus some repairs required to the roof structure & coverings. The scope of works involved a full strip-out and significant reconfiguration of the floor plates to achieve a more contemporary, open-plan living layout. The client also requested the installation of comfort cooling to the first and second floor rooms, along with the creation of entirely bespoke bathrooms and a custom-designed kitchen. The project required the expertise of multiple specialist subcontractors, including the application of Tadelakt Moroccan plaster in the master bathroom and two guest bathrooms. In the later stages, works extended to the exterior, with complete landscaping and the addition of a luxury spa area at the rear of the garden.




Orangery Extension to 16th Century Locally Listed Barn
PRIME RESIDENTIAL
Design and build of a stone orangery to a locally listed 16th century barn. Project involved carefully amalgamating both the wishes of the client and that of the local conservation officer. Stone was handpicked at local reclamation yards to get correct mix of natural stone. Weathered timbers scarf jointed and intricately cut to hide steel structural beams. Windows were fitted into bespoke oak frames to match existing window styles found in the barn.




East Hanney - Oxford
PRIME RESIDENTIAL
Transform your home with a modern extension designed to maximise natural light and create a seamless sense of openness. This contemporary upgrade features a sleek, stylish kitchen that flows effortlessly into a spacious living area, complete with a dedicated bar zone perfect for hosting and entertaining. Clean lines, smart design, and expansive glazing come together to deliver a bright, inviting space that elevates everyday living.





Girls' Day School Trust
EDUCATION - FULL CLASSROOM MODIFICATION & REFURBISHMENT
Refurbishment to 12no. Classrooms and 8 offices as well as creating a new common room space. The original building was comprised of painted block work walls internally which did not present well. Moreover, other items of the fit out were tired like the carpet and ceiling tiles. We undertook a scope of works that allowed us to dot and dab plasterboard sheets onto the original walls to give a smarter and warmer feel to the teaching and office spaces. Moreover,, we undertook the enabling works for air conditioning to be installed in the working spaces. Due to the amount of IT installations, incumbent fire systems as well as further M&E this project particularly showcased our ability to manage integration with multiple stakeholders in a project




Portsmouth School
EDUCATION - WC REFURBISHMENT
Refurbishment work for WCs that dated back 30 years previous. WC's were extremely dated and not suitable for the prep school it was serving. The DBS requirements were followed with all members of staff either holding DBS or DBS Enhanced certificates. Moreover, there was asbestos to be dealt with during the rip out stage. This was dealt with via our trusted sub-contractor alongside our expert training that all our employees receive.




SEGRO Warehouse
Refurbishment
Following the departure of a long-term tenant, we were instructed by Segro to undertake the clearance of the 21,500 sqft warehouse and office. Works included the removal of all existing mezzanines & cold stores. Future works at the site will see the full refurbishment of the warehouse and office with new roofing to the warehouse and a complete overhaul of the office building.




